A data centre in India needs roughly half an acre of land per MW of IT load, on our calculation from Anarock’s 2026 size bands. Data centre land costs from about ₹3 crore per acre for 100 to 500 MW parks to ₹35 to 60 crore per acre for small sites in Mumbai’s suburbs, on the same Anarock benchmarks. Savills counted more than 120 acres of data centre land transacted in H1 2026, as reported by Communications Today. Land counts as powered land only when the utility has committed MW and a date in writing. State authorities such as YEIDA in Uttar Pradesh and MIDC in Maharashtra have dedicated data centre parks or plans for them.
Before you start
- Anarock size bands: 5 to 10 MW on 2 to 5 acres, up to 100 to 500 MW on 50 to 200 acres (midpoints about 0.4 to 0.5 acre per MW, our calculation).
- Recent deals: STT GDC paid ₹282 crore for 3.48 acres with a building in Navi Mumbai (our conversion from 14,093 sq m); Amazon Data Services paid ₹125.13 crore for 10.6 acres from Lodha.
- Parks: YEIDA lists a 100-acre Data Centre Park in Sector 28; MIDC will take up data centre parks under Maharashtra’s IT/ITeS Policy 2023 (S&R Associates); Cushman & Wakefield reports a planned 500 MW park near Hoskote in Karnataka.
- Building norms help: Uttar Pradesh (2026) and West Bengal (2021) allow FAR 3.0 plus 1.0 purchasable for data centres.
Land needed per MW for a data centre in India
| Facility size | Typical land (Anarock) | Acres per MW at the midpoint (our calculation) |
|---|---|---|
| 5 to 10 MW | 2 to 5 acres | About 0.47 |
| 10 to 30 MW | 5 to 15 acres | About 0.5 |
| 30 to 100 MW | 15 to 50 acres | About 0.5 |
| 100 to 500 MW | 50 to 200 acres | About 0.42 |
Land per MW is not fixed. The ratio depends on how many storeys the building has, the FAR the state allows, and how much of the site goes to the substation, generators and fuel. Anarock advises buying 30 to 50% more land than phase 1 needs.Anarock
Data centre land prices in India
| Facility size | Land price per acre (Anarock, 2026) |
|---|---|
| 5 to 10 MW | ₹35 to 60 crore in Mumbai suburbs; ₹4 to 10 crore in secondary cities |
| 10 to 30 MW | ₹5 to 20 crore |
| 30 to 100 MW | ₹4 to 12 crore |
| 100 to 500 MW (Navi Mumbai, outer Chennai, Noida parks) | ₹3 to 10 crore |
| Buyer | Land | Price | Date |
|---|---|---|---|
| STT GDC India | 14,093 sq m (about 3.48 acres) with a building, TTC Industrial Area, Navi Mumbai | ₹282 crore | Registered 22 May 2026 |
| Amazon Data Services | 10.6 acres from Lodha, Thane district | ₹125.13 crore | Reported June 2026 |
| Amazon Data Services (AWS) | 38.18 acres from Lodha, Palava | More than ₹450 crore | 2024 |
| Lumina CloudInfra (since acquired by AirTrunk) | 16 acres, Ambattur, Chennai | More than ₹500 crore | Reported January 2026 |
| Brookfield | 30 acres, Ghansoli, Navi Mumbai | ₹600 crore | Reported as agreed, August 2021 |
Savills counted more than 120 acres of data centre land transacted in H1 2026, as reported by Communications Today.Communications Today
Data centre parks in India
- Uttar Pradesh: YEIDA lists a 100-acre Data Centre Park in Sector 28. UP’s 2026 policy defines a Data Center Park as a data centre with at least 40 MW of total load capacity.
- Maharashtra: according to S&R Associates, the IT/ITeS Policy 2023 says MIDC will take up data centre parks with all prior clearances for land allotted to data centres.
- Karnataka: Cushman & Wakefield reports a planned 500 MW data centre park near Hoskote, with the government committing solar power and treated water, and 500 MW planned at Mysuru and Mangaluru.
- Andhra Pradesh: ETV Bharat reported in October 2025 that the state offered Google’s subsidiary Raiden Infotech a 25% discount on 480 acres across Rambilli, Adavivaram and Mudasarlova, and Tarluvada.
- Private parks: Lodha has earmarked 400 acres at Palava for a data centre park, as reported by Business Standard in April 2026.
FAR, ground coverage and stamp duty rules for data centres
Uttar Pradesh’s 2026 policy gives data centres base FAR 3.0 free plus 1.0 chargeable, keeps basement parking, storage and DG space out of FAR, extends service FAR to 40% for DG sets, allows ground coverage of up to 60% or as per byelaws, whichever is higher, and places no restriction on floor-to-ceiling height subject to overall height rules. It exempts 100% of stamp duty on land bought or leased from a government authority and gives a land subsidy of 25% of sector rates in the Madhyanchal and Paschimanchal regions (Paschimanchal includes Gautam Buddha Nagar) and 50% in Bundelkhand and Purvanchal.Government of Uttar Pradesh
West Bengal’s 2021 policy also allows FAR 3.0 plus 1.0 purchasable and 60% ground coverage.Government of West Bengal (via wbxpress)
What powered land means in India
In India, powered land means land with deliverable electricity for the load, documented by the utility, not land near a substation. In Navi Mumbai, Structure Research reports that the roughly 6 GW MSEDCL allocated to data centres is close to fully committed and that new builds are moving to Panvel, Taloja and Rasayani, where separate substations can be commissioned.Structure Research
How Invariant helps
Invariant does not list Indian land. For a parcel you are looking at, it checks how the site gets power and the evidence behind the MW, screens seismic, flood, groundwater and airport height risk, and maps the approvals. Send the coordinates or the state, the MW and the date you need power.
More on data centres in India
Questions that come up.
How much land is needed for a 1 MW data centre?
Anarock’s size bands work out to about 0.4 to 0.5 acre per MW at their midpoints (our calculation), but land per MW is not fixed. The bands start at 2 to 5 acres for 5 to 10 MW. A small facility’s land need depends mostly on how many storeys the state’s FAR allows.Anarock
What does data center land cost in India?
Data centre land in India costs about ₹3 to 10 crore per acre for 100 to 500 MW parks, rising to ₹35 to 60 crore per acre for small sites in Mumbai’s suburbs (Anarock, 2026).Anarock
Where are the data centre parks in India?
India’s data centre parks include YEIDA’s 100-acre Data Centre Park in Sector 28 (Uttar Pradesh), MIDC data centre parks in Maharashtra, and Karnataka’s planned 500 MW park near Hoskote. Lodha has earmarked 400 acres at Palava for a data centre park.Yamuna Expressway Industrial Development AuthorityS&R AssociatesCushman & WakefieldBusiness Standard
What does data centre land cost per acre near Mumbai?
Anarock prices small sites of 5 to 10 MW in Mumbai’s suburbs at ₹35 to 60 crore per acre. Zee Business reported in June 2026 that Amazon Data Services paid ₹125.13 crore for 10.6 acres from Lodha in Thane district, about ₹11.8 crore per acre (our calculation).AnarockZee Business
What FAR do data centres get in India?
Uttar Pradesh’s 2026 policy and West Bengal’s 2021 policy both allow FAR 3.0 plus 1.0 purchasable and up to 60% ground coverage for data centres; both keep basement parking, storage and DG space out of FAR.Government of Uttar PradeshGovernment of West Bengal (via wbxpress)
Sources and references.
Primary sources checked for this guide on . The location, equipment, and operating plan determine which requirements apply to a project.
- AnarockData Centre: The Blueprint of the Digital Fortress in India (2026) ↗
- Communications TodaySTT GDC India buys Navi Mumbai land for ₹282 crore ↗
- Zee BusinessAmazon Data Services India acquires land from Lodha Developers ↗
- DatacenterDynamicsAWS acquires 38 acres near Mumbai for potential data center build ↗
- Entrepreneur IndiaBlackstone plans 216 MW data centre hub in Chennai ↗
- Cushman & WakefieldIndia Data Centre Market Overview H1 2026 ↗
- Business StandardCanada's Brookfield to buy 30-acre land in Navi Mumbai for ₹600 crore ↗
- Communications TodayIndia's data centre capacity additions jump 59% in H1 2026 (Savills) ↗
- Yamuna Expressway Industrial Development AuthorityIndustrial property and Data Centre Park, Sector 28 ↗
- Government of Uttar PradeshUttar Pradesh Data Center Policy 2026 (G.O. dated 9 July 2026) ↗
- S&R AssociatesIncentives and laws for data centers in Maharashtra (IT/ITeS Policy 2023) ↗
- ETV BharatAndhra Pradesh offers ₹22,000 crore incentives to Google’s Raiden Infotech for data centres ↗
- Business StandardLodha to develop 1 GW data centre capacity in MMR ↗
- Government of West Bengal (via wbxpress)West Bengal Data Centre Policy 2021 (notification of 6 September 2021) ↗
- Structure ResearchMumbai and Pune data centre report 2026 ↗
